Data and Information

How to Find the Best Place for Borehole Drilling in Nigeria

Get in touch on Whatsapp now: WhatsApp
CLICK HERE TO BOOK FAST ONLINE →

Finding the best place for borehole drilling is not as simple as selecting an empty corner of a compound. A location may look convenient above ground but have poor groundwater potential, difficult drilling conditions or a high risk of contamination.

Before bringing a drilling rig to the site, the land should be assessed by a qualified hydrogeologist or geophysical surveyor. A proper survey studies the geology, groundwater potential and surrounding conditions so the drilling contractor can choose a more suitable point. Research on borehole siting in Nigeria shows that geology, soil, drainage, elevation and nearby infrastructure can all affect whether a location is suitable.

Planning the survey, equipment movement and site access properly can prevent expensive delays once fieldwork begins.

Start With a Geophysical Survey Instead of Guesswork

Some property owners choose a drilling point because it is close to the kitchen, gatehouse or proposed water tank. Convenience matters, but it should not replace technical assessment.

A geophysical survey helps identify underground formations that may hold water. The specialist may mark one or more possible drilling points and recommend the strongest option based on the readings taken.

Even when neighbouring properties have productive boreholes, this does not guarantee that the same depth or drilling point will work on your land. Groundwater conditions can vary within a relatively small area.

The survey should be completed before the drilling crew, compressor and pipes are transported to the property.

Keep the Borehole Away From Possible Contamination

The selected location should not be too close to septic tanks, soakaways, refuse areas, drainage channels or places where chemicals and fuel are stored.

This is particularly important in densely developed areas of Lagos, Abuja, Port Harcourt, Ibadan and other Nigerian cities where buildings, septic systems and water facilities may be positioned within limited space.

A surveyor should inspect the entire property rather than assessing only the space suggested by the owner. The technically suitable point should also allow the borehole to be protected from wastewater, flooding and careless surface activity.

After drilling, water testing is advisable before the supply is used for drinking, food preparation or commercial production.

Make Sure the Drilling Rig Can Reach the Location

A technically suitable drilling point can still create problems if the equipment cannot reach it.

Drilling rigs, compressors, support vehicles and pipe deliveries need enough access and working space. Narrow gates, overhead cables, weak paving, low balconies and unfinished drainage channels can make mobilisation difficult.

Before confirming the site, check:

  • Whether the drilling vehicle can enter the compound
  • The width and height of the gate
  • Space for pipes and other materials
  • Ground conditions around the drilling point
  • Nearby electrical cables or structures
  • Where drilling waste and water will flow
  • Whether neighbours or estate management require notice

Travo.ng can help coordinate vehicle hire, equipment delivery, cargo movement and transport for surveyors, drilling crews and field materials.

Think About the Pump, Tank and Plumbing Layout

The best place for borehole installation should also work with the property’s water system.

Consider where the storage tank will be located, how pipes will run through the building and where the pumping equipment will be protected. Placing the borehole far from the tank may increase the amount of piping, cabling and labour required.

However, choosing a poor drilling point just to reduce pipe length can lead to greater expenses later. The groundwater assessment should come first, followed by a practical plumbing and power plan.

The site should also remain accessible after construction. Technicians may need to inspect the pump, replace cables or carry out maintenance in the future.

Plan for Delays Before the Crew Arrives

Drilling work may be delayed when equipment arrives before access is cleared or when essential materials are still in another city.

For example, a contractor working in Ogun State may need pipes delivered from Lagos, while a specialist surveyor may be travelling from Ibadan. If these movements are arranged separately without a clear schedule, workers and machinery may remain idle on site.

Before mobilisation, confirm:

  1. The survey has been completed.
  2. The drilling point has been marked.
  3. Access has been cleared.
  4. Pipes, casing and other materials are ready.
  5. Accommodation is arranged for multi-day work.
  6. Transport is available for the crew and equipment.

Travo.ng supports project teams with courier delivery, cargo logistics, hotel reservations, vehicle hire and interstate transport coordination.

Arrange Borehole Project Logistics With Travo.ng

Finding the best place for borehole drilling requires technical assessment, safe positioning and realistic access planning. Guessing the location can waste money, while poor logistics can keep surveyors, equipment and contractors waiting unnecessarily.

Travo.ng helps property owners, engineering companies, drilling contractors and field teams arrange transport, accommodation, equipment movement and delivery support across Nigeria.

With the survey and logistics organised before mobilisation, the project has a better chance of starting smoothly and avoiding preventable costs.

CLICK HERE TO BOOK NOW →
WhatsApp Chat